从矿石到产品,全程溯源
The Materials Atlas
材料 矿山与矿床 加工与精炼 溯源记录 供应链 企业 国家/地区 资讯
按货架浏览材料 电池材料 稀土元素 铜与电气 半导体材料 核材料 航空航天与国防 贵金属 钢铁与合金金属 工业矿物 农业矿物 能源原材料 矿石矿物 元素周期表
需求 终端市场 技术 材料计算器 地图 筛选器
学习与工具 了解术语表 数据问答AI智能体 研究与数据API ★ 已保存
关于 关于我们方法论 数据来源联系我们 免责声明
阅读选项
🧭 引导视图 初次接触矿石品位、精矿、精炼、副产品等概念?我们在您浏览时对每个术语进行解释,语言浅显易懂,数据相同,帮助内置其中。
⚡ 专家视角 您已熟悉这一行业,直接看数据即可——简洁、快速、紧凑,无附加说明。此为默认视图。
主题
界面语言
深度 材料页面分四个级别撰写。在任意材料页面选择后,系统将记住您的选择。
★ 已保存 研究与数据
Uranium

核材料

Uranium U · 92

A heavy, faintly radioactive metal whose nucleus can be split, releasing about two million times more energy per kilogram than burning coal.

Uranium ore and "yellowcake" uranium concentrate at the Gre… · Siarhei Besarab · CC BY-SA 4.0 · Wikimedia Commons

这是什么?

A heavy, faintly radioactive metal whose nucleus can be split, releasing about two million times more energy per kilogram than burning coal.

为何重要?

Nuclear power supplies roughly a tenth of the world's electricity and around a quarter of its low-carbon electricity, all from this one element.

Where it is in the Earth

Uranium is a naturally occurring element, present in small amounts throughout the Earth's crust. It sits at the heavy end of the periodic table, and like most heavy elements it was forged inside dying stars and delivered to the early Earth by asteroid bombardment. In its dispersed state it is actually more abundant in the crust than silver or mercury, but at those background concentrations it cannot be mined economically. What geologists look for is any process that has gathered uranium from a large volume of rock and concentrated it into a much smaller one.

Several quite different geological processes can do this. The most productive, measured by the grades it achieves, is the unconformity-related deposit, formed where ancient, uranium-bearing groundwaters migrated through permeable sandstone and then encountered a sharp chemical boundary — an unconformity, meaning the old erosion surface where one rock sequence rests on a completely different one beneath. The chemical contrast caused dissolved uranium to precipitate as the mineral uraninite, also known as pitchblende, in veins and pods that can reach extraordinary concentrations. The deposits around the Athabasca Basin in northern Canada are the type example, with grades that can exceed fifteen percent uranium, a figure essentially unmatched anywhere else in the world.

Other important deposit styles include sandstone-hosted deposits, where uranium is caught in permeable sedimentary layers by a chemical reducing agent such as organic material or iron sulfide minerals. These are lower grade but often occur in flat-lying sedimentary basins that are well suited to a particular extraction method discussed in the next section. A third style is the iron-oxide copper-gold deposit, or IOCG, of which Olympic Dam in South Australia is the largest known example; uranium there is a secondary product recovered alongside copper, gold and silver from a single enormous orebody deep underground. A fourth occurrence is the ancient Witwatersrand conglomerate reefs of South Africa, where uranium accumulated alongside gold in fossil river gravels more than two billion years ago. Each deposit type reflects a different chapter of geological history, which is why major uranium mines are scattered across geologically distinct terrains rather than concentrated in one belt.

Getting it out

The method used to extract uranium depends almost entirely on the geometry and grade of the deposit and on what lies above it. Where ore is shallow and the ground above it can be economically stripped away, open-pit mining is used: large shovels and haul trucks remove the overlying rock — called overburden — and then work down through the ore. Where ore sits deep or in narrow high-grade veins, underground mining is necessary, which means driving tunnels and extracting rock in enclosed workings. Because uranium ore is radioactive, underground mines require careful ventilation to prevent the accumulation of radon gas, a radioactive decay product.

Cigar Lake in northern Canada illustrates a third approach forced by unusual conditions. The ore there is so rich and the surrounding rock so water-saturated that conventional drilling and blasting would be dangerous. Instead the ground is frozen artificially and ore is cut by a high-pressure water jet — a technique called jet boring — producing a slurry that is pumped to the surface without workers ever entering the ore zone directly. This adds cost but the extraordinary grade of the deposit makes it worthwhile.

A fourth method, and the one that has grown most rapidly in recent decades, is in-situ recovery, sometimes called in-situ leaching or ISL. Rather than physically excavating rock, operators drill a pattern of injection and recovery wells into a permeable uranium-bearing sandstone aquifer. A mildly acidic or alkaline solution is pumped down the injection wells, dissolves the uranium from the surrounding rock, and is then pumped back up through the recovery wells as a uranium-bearing liquid. No ore is brought to surface; no tailings heap is created. This works only in the right kind of sandstone geology, and the long-term behaviour of the underground chemistry requires careful management, but where conditions allow it the cost per tonne of product can be substantially lower than conventional mining. Kazakhstan, the world's largest uranium producer, relies almost entirely on this method.

Grade matters more in uranium mining than in most other extractive industries because uranium ore is handled, transported and processed under radiological controls that add cost regardless of grade. A deposit producing a few hundredths of a percent uranium requires moving large volumes of rock to yield a small amount of metal, whereas the high-grade Canadian unconformity deposits yield many times more product per tonne of ore mined. The ratio of waste rock removed to ore extracted — the strip ratio in open-pit operations — is one of the key numbers that determines whether a deposit can be mined at a profit.

What pulls on it

Effectively all commercial demand for uranium exists because of nuclear power. A nuclear power station burns no fuel in the chemical sense; instead, neutrons cause uranium-235 nuclei to split — a process called fission — releasing heat that drives steam turbines just as coal or gas would. The amount of uranium required to produce a given quantity of electricity is small by mass compared with fossil fuels, but it is not trivial in terms of the specialised processing chain needed to prepare it. A pressurised water reactor, the most common type in service today, requires somewhere between 150 and 250 tonnes of natural uranium per gigawatt of electrical capacity per year of operation, according to the figures this page carries.

Demand is therefore a function of how many reactors are operating, at what capacity, and what kind of fuel cycle they use. Reactors are long-lived assets: once built, a plant may operate for sixty years, requiring a reliable fuel supply for that entire period. Utilities typically hold multi-year contracts and strategic inventories rather than buying uranium on short notice, which means the spot market represents only a fraction of actual transactions and spot prices can move sharply on relatively small volumes of trade.

The direction of demand over the coming decades depends on decisions being made now about new reactor construction. Several countries that reduced nuclear capacity after the Fukushima accident in 2011 are reconsidering those decisions in the context of electricity grid decarbonisation. A number of countries are building new large reactors, and a separate strand of development involves smaller modular reactor designs that have not yet reached commercial deployment at scale. If nuclear capacity grows, uranium demand grows with it; if planned reactors are delayed or cancelled — as has happened repeatedly in different countries over the past four decades — demand growth is correspondingly deferred. There is no significant use of uranium outside nuclear applications that would change the demand picture independently.

Turning ore into product 级别 3

Uranium ore, once at surface, is crushed and ground in a process called comminution to break down the rock structure and expose the uranium minerals to chemical attack. The ground ore is then leached — dissolved — using either sulfuric acid in acidic circuits or a sodium carbonate solution in alkaline ones. The choice depends on the mineralogy of the host rock: carbonate-rich rocks consume acid rapidly, making alkaline leaching more economic despite its slower kinetics. In-situ recovery operations skip the comminution entirely because leaching happens underground, but the chemistry of the recovery solution follows the same logic.

After leaching, the uranium-bearing solution is separated from the solid residue by counter-current decantation or filtration, then purified using solvent extraction or ion exchange — processes that selectively strip uranium from solution while leaving most impurities behind. The purified uranium is then precipitated, typically as a mixed uranium oxide, dried and packaged. The resulting product is yellowcake, nominally U₃O₈, which is the form in which uranium is traded from mine sites. The colour and exact composition vary depending on the precipitation reagent used; not all yellowcake is literally yellow.

Yellowcake is not yet reactor fuel. It must first be converted to uranium hexafluoride (UF₆) at a dedicated conversion facility — Port Hope in Canada is one of the few outside Russia or China — and then enriched. Natural uranium contains only a small fraction of the fissile isotope uranium-235; most light-water reactors require fuel in which that fraction has been increased several-fold, a process called enrichment carried out in large centrifuge cascades such as those at the Georges Besse II plant in France. After enrichment, UF₆ is converted again to uranium dioxide (UO₂) powder, pressed into ceramic pellets and sintered at high temperature to form the fuel pellets loaded into reactor fuel rods. Each conversion step is a potential bottleneck: conversion and enrichment capacity is concentrated in a small number of facilities and a small number of countries, and expanding that capacity takes years of engineering and regulatory work.

Substitution and recycling 级别 3

Within a given reactor design, there is no substitute for uranium as the fissile material. Some reactor designs can use thorium as a fertile material — meaning neutron bombardment converts it to fissile uranium-233, which then sustains the chain reaction — but thorium reactors remain at the research and demonstration stage and would not displace uranium demand in the near term. Mixed oxide fuel, or MOX, blends plutonium recovered from used reactor fuel with uranium dioxide; this extends the energy extracted from a given amount of mined uranium and reduces the amount of fresh uranium needed, but it does not eliminate it. MOX fabrication capacity is small relative to the total fuel market.

The more meaningful substitution question at the system level is whether other low-carbon electricity sources — solar photovoltaic, wind, hydropower — reduce the number of nuclear plants built and therefore the total uranium demand. This is a question about energy policy rather than materials chemistry, and the answer varies by country and grid characteristics. At the level of an individual reactor already in service, the economics strongly favour continued operation because the capital cost is sunk and uranium fuel is a relatively modest fraction of total running cost; substitution risk applies mainly to the decision whether to build new capacity.

Recycling of uranium is technically possible and practised in some countries. Used reactor fuel contains unburned uranium that can be chemically separated — a process called reprocessing — and reused as reactor fuel, sometimes after re-enrichment. France reprocesses a significant portion of its used fuel. However, reprocessing is politically contentious in some countries because the same chemical process separates plutonium, which has weapons relevance, and the economics of reprocessing are sensitive to the prevailing price of freshly mined uranium. When mined uranium is inexpensive, reprocessing is harder to justify on cost grounds alone. The result is that the contribution of recycled uranium to total supply varies considerably by country and by the prevailing market conditions, without eliminating dependence on primary mining.

正确读取数据。 Production is quoted as tonnes of uranium metal (tU) or as U3O8; 1 tU = 1.1792 t U3O8. Mixing the two is the classic uranium reporting error. Yellowcake (U3O8) from the mine, then UF6 for enrichment, then UO2 fuel pellets.

其在岩石中的来源

所有含矿矿物 →

实际承载以下内容的矿物: uranium. 只有其中某种物质的富集程度足以覆盖开采成本,矿床才能成为矿体。

价格

Uranium, global price

年度平均值US$ per pound

1995 · 10.78 高 136.2 US$ per pound 2026 · 69.23

基准: IMF global price of uranium — NUEXCO restricted price, U3O8. 年度平均值,来源: FRED (IMF primary commodity prices) · 来源 ↗. 以下为参考年度均价,非实时市场报价。

产出该材料的矿山

所有矿山 →
Cigar Lake
Cigar Lake, Canada — The highest-grade large uranium mine in the world. NRC Chair Christopher Hanson Visits the Cigar…, CC BY 2.0 via Wikimedia Commons

Cigar Lake →

其加工与精炼地点

工厂类型 阶段国家/地区角色
Georges Besse II Enrichment Plant 富集厂精炼 France输入
Port Hope Conversion Facility 化工厂精炼 Canada输入
终端市场其在彼处的用途重要性
Nuclear Power The fuel 定义

某项技术的需求用量

"强度"是指单位产品所含某种材料的用量。此处为参考区间——实际用量因制造商和年型而异,且随着工程师不断探索减量化设计,所有数值均呈下降趋势。
技术数量 报价基准
Pressurised Water Reactor Depends on enrichment level and tails assay; the loaded fuel is far less. 150.0–250.0 t per GW of capacityNatural uranium needed per year of operation

Indicative range compiled from published technology studies and chemistry; verify against a manufacturer specification before use. 在物料计算器中按任意规模运行这些数据 →

出口管制

国家/地区管控适用于
RussiaExport ban Steel waste and scrap, tungsten scrap, and enriched uranium (2022).

USGS Mineral Commodity Summaries 2026, table 4 — controls in effect as of January 2026, excluding controls since lifted.

跟踪其跨境全程

全部溯源记录 →

这批材料实际经过的路线——每个国家、每位托管方,以及每个环节留下的内容。

Kazakh uranium to a fuel assembly in a reactor The most tightly watched journey in this atlas: every kilogram is accounted for, at every border. 来自 Kazakhstan · Sandstone-hosted uranium recovered in situ, no rock…

已追溯的供应链

新闻动态

更多 →

Why Uranium Stocks Are Falling as U.S. Production Triples

OilPrice.com03 Sep 2026

SW US CEO chat: Energy Fuels pivots to rare earths

The Northern Miner01 Sep 2026

India and Uzbekistan eye uranium deal as ties grow

World Nuclear News01 Sep 2026

U.S. uranium production more than tripled in 2025 and was the highest since 2017

U.S. Energy Information Administration28 Aug 2026

Niger awards Arlit uranium mining permit to state-owned company

World Nuclear News26 Aug 2026

Atomic Eagle reaches agreement on Niger uranium project

World Nuclear News24 Aug 2026

材料

所有材料 关键矿产 稀土 电池材料 矿石矿物 元素周期表 筛选器

地层

矿山与矿床 加工与精炼 国家/地区 地图

经济体

溯源记录 供应链 终端市场 技术 企业 材料计算器

了解

了解术语表 数据问答AI智能体 研究与数据开放 API 资讯★ 已保存

关于我们

关于我们联系我们 方法论数据来源 编辑方针 隐私政策使用条款 免责声明